Retro Tee T Shirt Hot Rod Drag Race Racing Weird Oh Endsville Eddie

Retro Tee T Shirt Hot Rod Drag Race Racing Weird Oh Endsville Eddie

USD 24.99 USD
SKU: HxDxBAh5
Brand: Unbranded
Condition: New without tags

Heather grey tees are 90% cotton and 1% polyester. White ringer tees are 100% cotton, 3/4 sleeves raglans are 100% cotton, and specialty black ringers are a cotton poly blend. Classic black, white, and sand tees are 100% cotton.

Categories: Men

Specifications

Tee Colorwhite
PatternSolid
Sleeve LengthShort Sleeve
NecklineCrew Neck
Occasioncasual
ColorWhite
Sleeve Typeshort
Materialcotton
Fitregular
BrandUnbranded
Size TypeRegular
DepartmentMen
TypeT-Shirt
Modelgildan
StyleGraphic Tee

The solid design means you can wear it to the gym or out for coffee.

Related Items